Things moving along for brewery at St. Joe’s (updated)

The following was posted quite a bit ago on the Ravens Head Brewing facebook page:

The Ten Broeck Triangle website has looked for an application or meeting agenda and has come up dry. It could be in processing or tied up somewhere, but it seems as if there’s no big red lights for the brewery to repurpose the church.

Update:

Brennon Cleary, the president of Ravens Head Brewing shed some light on the subject and has told us that they’ve pulled permits and will be getting a September 12th or September 27th hearing.

There’s been a few rumblings at the purported lack of transparency with these dealings. I’m quite unfamiliar with the processes involved but for them to be posting updates publicly provides at least some level of transparency.

Similar Posts